Skip to main content

Reply to "New Layout vs. Old (Build Thread)"

Here's the subroadbed design as drawn in CorelDraw. And here's how it looks in the space. I drew the room design in MS Visio. This is really helpful in understanding what works and what doesn't.

 

1408 Construction letter sized

 

Here's the room:

 

1408 layout 1 rev

 

I'm planning a mountain in the back right corner and some more aggressive landscaping on the left-hand edge where the outer loop is at a higher level than the inner. I didn't want the elevated level to block the view of the inside so I've limited it to the back where it's elevation will make it easier to see.

Attachments

Images (2)
  • 1408 Construction letter sized
  • 1408 layout 1 rev
Last edited by Trainman2001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×