Let me start by noting that I made a big mistake... I decided to spend yesterday evening reading all about Patrick K's layout progress and now feel completely inadequate. I think he is super-human. No one can build that much layout in that short length of time. I simply can't understand it. I was even thinking that who would care about my puny effort after seeing what he's done. But then I thought, yes, but... what I'm building is far more in the reach of average railroaders so I will continue posting.

 

By appearances, yesterday's work session didn't accomplish anything resembling Saturday's marathon session, but looks can be deceiving. I unpacked all of the old L-girders that will comprise the rest of the framework. They were all duct-taped in bundles from when we moved. I have most of the girder lengths noted on the master print and if they're missing I get them from the computer drawings. My original plan had the new girders and old all mixed up since I was attempting to use the old girders in their actual length. I was going to use new girders to fill in the missing pieces. But as Clauswitz said, "Strategy ends when the first shot is fired". Once I started building the wall supports I decided to build all the new girders for the back wall and use the existing ones to build the rest. As it stands now, I probably have enough old ones to complete the layout. I have materials for three more 8 footers if needed.

 

Tomorrow my grandson's coming over to finish up his Super Hornet. He and his family just got back from London where they watched the Olympics. It was quite a trip and the kids should have a lot to tell their class when they answer the perennial question, "So what did you do with your Summer?" While he's working on the plane, I'm going to work on the railroad.

 

 Girder Array 1

 

I then started laying out all the girders on the floor based on length in their respective locations. After that I'll set them up at their correct separation distance and compare that to the leg sets that are already constructed. To save labor, I'd like to use as many intact sets as possible. If I have to adjust their separation distance, I'll reset the cross-braces to the needed width.

 

 Girder Array 3

 

I have to keep reminding myself that the work table in the middle of the room is actually part of the new layout. As I mentioned before, I cobbled it together as a work table to build the wings of the 1:16 scale RC B-17 that I built in 2010. Right now I need that table for plans, tools and screws.

 

The goal is to get OSB onto the back girders ASAP so that it can be enlisted as the new work surface. Then I'll dismantle the existing table and incorporate it into the layout.

Attachments

Images (2)
  • Girder Array 1
  • Girder Array 3