Today, I started building the front side of the layout. First thing I did was take one of the large right front curved pieces...the outer one, clamp some stock on the end so it could hang onto the existing right-end piece, and then test to see where the curve actually intersects the front assembly. As I suspected, the entire front assembly was about 9" inches too far to the left (facing the layout). Since nothing was mounted on this assembly other than the spindly girders, I was able to slide the whole after rightward. I was also a little bit too forward so I moved it back towards the middle of the layout. This move was sufficient to put that bridge piece directly over the girder it was supposed to be over based on my drawings. So the drawings were correct.

I checked on more thing. I swung the curve in an arc that would be the same when the swing out portion is installed. It clears the column by about an inch. I was very pleased. Swinging this out will give nice access to the insides of the layout.

Name: Front Joists 01.jpg Views: 15 Size: 99.3 KB

With that out of the way, I checked all the dimensions and decided that the front side joists had to be 65" long. I decided to consume all of the old joists before cutting any more new 1X3s. 

Since none were even close to that length, I spliced two together in various ways to give me the correct length. I made some marks on the existing platform as a guide and just got to work. 

Name: Front Joists 02.jpg Views: 15 Size: 93.4 KB

Pretty soon they were all gone. 

Name: What's Left.jpg Views: 15 Size: 105.2 KB

I laid them out on the girders and did some final fitting. Then I went and checked the clearances to the other columns. As I foresaw, the clearance is a tight 19", but passable. Any closer and we'd have a problem. There's adequate access to the furnace as planned.

Name: Front Joists 03..jpg Views: 15 Size: 76.9 KB

Then the grandsons came over and I put Jack to work. I have that small power screw driver from Black and Decker and it's perfect for a kid. So Jack and I went to work clamping the joists, drilling the holes and driving the #8 X 1.5" SPAX Star-head screws. I clamped and drilled and Jack drove the screws home. He likes that and he got a chance to roll all over the place with the scooter and I didn't have to get up and down. We're on schedule to get trains running by Thanksgiving (or thereabouts).


I'm designing latching methods to hold the swing-out portion to the main layout. Here's a drawing showing two variations. I would greatly appreciated additional input. Clem uses a large case-type latch. Where did you get it?

 

Latch Design

Attachments