JerryG posted:Nice! Love those long runs. Thanks for posting the cool videos.
What's the next project on the layout?
All 11 switches need to be wired up, as do the 7 UCS’s. Then putting down track bed and permanently affixing the track. Once that’s done, I’ll start trying to resuscitate my old accessories. But now at least I can enjoy the layout while I work on it.