Skip to main content

Reply to "New Millhouse River Turntable Install - Detailing Finished !!"

Thanks, Joe - I forgot to add that I'm going to epoxy the bolts in place on the top of the layout before I seal up the holes in the foam so that, if I ever have to take the TT out for some reason, I can simply unscrew the nuts from below and drop it down w/out having to tear up the foam on the layout surface.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×