Skip to main content

Reply to "Blackwater Canyon Line - May 27, 2024 - Thinking About a Downtown Structure"

Thank you Andy, Marty, Mike.  I was fiddling with it last evening some.  I do think I will use some thinner, sturdy material for the crossover above.  I may just glue the cork roadbed to that material and forego the Homasote at that point.  I won't be using Homasote on the bridges that will be at the raise up access point a few feet away either.  Mike, the thinner material doesn't even have to be cut on a curve, because I was going to extend the scenery out a bit on either end to hide the fact the track is crossing over itself there.  Thank you everyone for all the good ideas.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×