Skip to main content

Reply to "Blackwater Canyon Line - May 17, 2024 - Thinking About a Downtown Structure"

All the planning usually goes out the window once the construction starts Mark. At least you have a few options to work with to see what works best.
I remember a layout build thread on here from a while back. The OP used a short block of 2X4, about 4" long, to as a guide to bend GG flex. He marked the rails on the surface of the block and cut the three grooves into the block. I remember the pix of his curves and they were nice and uniform.

Bob

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×