Skip to main content

Reply to "Blackwater Canyon Line - April 6, 2024 - Sanky Wanky Coffee Co, Almost Done"

Pat, I had only partially realized what you are saying, but now I agree with it all.  I posted an initial idea influenced by ideas Dave and Jason were working on in other topics.  John C brought up the mountain layout based on the Blackwater Canyon.  Amazing that he picked that, when I had thoroughly researched the prototype almost 20 years ago and had a crude plan developing, before family took up more of my time.  

John came up with a concept of bringing cars and engines off each end of the layout.  Dave came up with an idea for a continuous run option.  I didn't want trains crossing over each other decending the mountain and wanted to incorporate both John and Dave's concepts into a longer run, but still giving the point to point flavor.

The software gave us the opportunity to calculate grades and clearances, and I thought why not test my engines to see what they can pull uphill.  Time on the route was a concern to, so John suggested I mock that up!  

This is just one of the things that is great about OGR Forum.  Collaboration.  Back long ago, I actually built a layout where I made a clay and cardboard mockup of my layout.  It was not to scale, but I followed it during construction and scenery.  This was before I had ever used a DOS computer.  I had absolutely no input from anyone except what I read in magazines.

Thank you Pat for your observation!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×