Skip to main content

Reply to "Blackwater Canyon Line - April 6, 2024 - Sanky Wanky Coffee Co, Almost Done"

Well, it has been almost two months since I last wrote.  I haven't made any progress on the layout, but have spent a bit of time on a 2 x 4 module to try some techniques and to give myself a nicer backdrop for photo shoots of rolling stock until the layout progresses.

I made the base of scrap 1 x 4s and some 1" blue foam I had.  I glued down the riser for the track and the cork roadbed.  I sanded the cork smooth, but the track is just sitting there for now.  I plan to spray paint it with Testors CreateFX Gravel Gray.  I want to see how that looks for a temporary ballast, as I am thinking of doing that on the impending layout.  It takes me so long to get ballast down, I think this will be a good temporary stand in.  I also bought the Pennsylvania style tunnel portal and wings last week.  I just have them leaning in position to get an idea how I want to build up my mountain.  I bought them at Hobby Express in Cranberry Township, Pennsylvania, and thought the manufacturer's name was on the wrapper.  I'm thinking Woodland Scenics, but don't know for sure. When I got home, I saw there was only a price tag on the shrink wrap, so I am not sure who made them.  They are a slightly flexible foam.  So, with my Legacy F7 set and an Atlas 2-bay hopper, you get an idea of how I envision this for photo shooting.

2017-09-05 15.50.502017-09-05 15.51.13

I did get a chance to start accumulating some wood for the layout.  More on that later.

Attachments

Images (2)
  • 2017-09-05 15.50.50
  • 2017-09-05 15.51.13

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×