Skip to main content

Reply to "Blackwater Canyon Line - April 6, 2024 - Sanky Wanky Coffee Co, Almost Done"

Mark Boyce posted:

I reported in my progress a few times on the "What did you do on your layout today" topic.  Here is a summary.  I glued down and sanded cork roadbed.  Before laying track I spray painted the cork with Rustoleum American Accents Stone Gray Stone spray paint.  I saw another Forum member write about this, so it is not my idea.  I like to put in most of my scenery before ballasting.  I think it is very passable in the meantime for ballasted track.  Who knows, maybe I will never actually ballast the track.  I don't like ballasting.

2019-03-03 16.02.402019-03-03 16.02.502019-03-03 16.03.02

Here is what the second section i did looks like.  I must caution you that little hard particles will float around and get on everything within a couple feet.  They can be scraped off without damage, but if my wife had noticed them on a couple items in the room, she wouldn't have been happy.

2019-03-03 16.03.16

Thinking of a recent discussion on track screws on the  "What did you do on your layout today" topic, I decided I was going t get #4 flathead screws and countersink.  I stopped at C. T. McCormick Hardware a couple weeks ago to pick up the Ross curved switch I needed, and Jeff showed me these #4 screws he stocks especially for what I wanted to do.  They are already black.  Hooray!  No daubing on paint and risking filling the x slot in the head.2019-03-03 16.45.26

So the next two photographs show how it looks right now.  I have gaps and power drops installed where I think they will be appropriate.  I then ran some temporary wire across the floor from the other room where the Z4000 and TIU now reside.  I clipped onto each drop to check that an engine could run okay.  I didn't do anymore wiring because I plan to locate the TIU on the yet to be built benchwork in the middle of the layout.  That will be the next phase of benchwork.

2019-03-03 18.01.132019-03-03 18.01.23

Here is how the flathead screws look.

 

2019-03-03 19.48.37

Monday, I placed an order for the second load of Mianne Benchwork that will take care of most of the length of the layout along the brick wall.

Thank you for taking a look.

Mark, I loved ! I think to make in my track-bed, but I bought a woodland ! 

Would it be all right?

I found this product in Brazil !!!

Fantastic !!

Attachments

Images (1)
  • InkedIMG_20190119_182545841_LI

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×