Skip to main content

Reply to "Blackwater Canyon Line - April 6, 2024 - Sanky Wanky Coffee Co, Almost Done"

Mark Boyce posted:

Mike, Thank you.  I use a ScotchBright to clean the tops of the rails.

Lew, Just be careful where you spray the texture paint.  I suppose it would be best to have an exhaust fan or do it outdoors.  Neither option was available on the roadbed.  I need to figure something out before I do that again.

Richie, Thank you.  Yes, I like the flatheads.  Oh another thing.  I did not use any glue on the track.  I want to be able to lift it up very easily if I need to.  Also, I always leave the switches float-no screws so the mechanism can work well.  I learned that from a Kalmbach publication back in my HO days.

That's good advice for someone starting out, Mark - I did the same on my recently completed Fastrack layout - no track screws in any switch and only one screw every 5-6 sections to keep it from possibly moving around and go lightly when tightening the screws down - you don't want to crank them down really tight and deform the track.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×