Skip to main content

Reply to "Blackwater Canyon Line - April 6, 2024 - Sanky Wanky Coffee Co, Almost Done"

Bob, Thank you very much!!  I can see what you are saying you did is similar to what I did with the upper level of my Christmas layout this past year.  I mounted 1/4" Masonite on top of plastic supports every foot or so.  Then I put the track on top of that.  It worked fine, and I have the Foam board with track and supports sitting intact in a corner to use again this coming Christmas.

I plan to use foam for the hillside with many town buildings on up the hill so part of the upper level will be covered with town, though I will have access to track on the back side.  Still, most of the buildings will be plastic, sot here won't be much weight.  I could certainly trim down the 2x2 supports and cut the unused 2x2 I bought for supports like you said.  In fact, to the left of the loop, the approach track will be held up with similar supports and a sceniced steep hillside down to the first level approach to the loop.

You have given me food for thought to be sure.  Thank you!  I wish you had more room too!  I know what it's like to cram a layout in a small space.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×