Skip to main content

Reply to "New Project - Coal Storage Elevator System"

I have finished building and  laminating everything on top of the coal flood bins. Next is the ground level conveyor shack and the conveyor itself. Other than staging the tall head house in the wrong position I think everything is looking good.

Dunning Coal elevator 002

Dunning Coal elevator 003

Attachments

Images (2)
  • Dunning Coal elevator 002
  • Dunning Coal elevator 003

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×