I am starting a project to construct a jet and rocket fuel storage facility. The fuel components will be shipped by rail and pumped into the tanks. After they are mixed together they will be shipped out by truck. There will be a large open top floating roof storage tank that will hold the jet fuel. The rocket fuel components will be stored in the two spheres, two horizontal tanks and the two vertical domed roof tanks. A truck loading rack and office building will be constructed at the other end of the facility.
Attachments
Original Post