Skip to main content

Reply to "NEW PROJECT STEEL MILL COMPLETED MODEL PICTURES MARCH 17,2023"

I made some pretty good progress on the blast furnace building. I also had to install light fixtures and set some equipment in place. I am installing some things I did not build. I think they are great with the exception of one thing and that is stairways and ladders to access them. You can see in the pictures how I cut away some handrail sections to add a stairway in two locations. I matched the handrails with brass rod that I bent to suit. It was a lot of fun and it gives the structure some character in that all the handrails are not the same style. You can see where I installed the elevator I tied into the top platform of the blast furnace. I plan to leave most of the blast furnace roof open on one side since some large piping will be installed and it allows for some viewing. REMEMBER PLATFORMS. WALKWAYS AND LADDERS TO CREATE A COOL STRUCTURE20230211_151116

Looking very sharp, Alan! Masterful!

Peter

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×