Skip to main content

Reply to "New to MTH DCS....question"

I do not subscribe to the start concept.  When I added DCS when it first came out, I simply inserted the TIU into the wires from transformer to control panel.  My layout was built for conventional, with some 75 toggled blocks on 6 "handles."  14 gauge wire goes from each toggle switch to each isolated block.  Ground is by a 12 gauge buss that goes all around the layout.  It works.

I strongly recommend you don't get chintzy on wire gauge.  On an 8x4 16 gauge is fine, but on a larger layout, my experience is use 14-gauge.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×