I see your point Garrett about the room those things take up...perhaps we can at least squeeze in the Lionel Gantry Crane and a freight dock...the crane can straddle one of the siding tracks...I suspect there will be some trial and error with the sidings and what can fit and how it operates.
I took what Jan and Carl worked for me and used some of what I was working on and came up with these. I think it's getting there...now I'm trying to lay in some buildings to get a sense of scale in terms of how much room is left...probably squeezed in about as much track as we're going to get in here.
At the end of the main road would be the passenger station...maybe two levels if I can get the elevated trolley line in there that I'd like to do.