John, I just rolled back up the screen and noted what looks like the second track for the yard is coming off the start of the outside curve. Is this an added on stub siding or the second yard track?
I believe my bump out allowed for both yard entrance tracks to come off of the double slip switch which would allow for a longer grade. Please refresh this old man's memory.