Skip to main content

Reply to "New Train Room Finally Getting A Layout! (Last Update: 07/02/2022)"

Moving along, all the Mianne stuff is assembled, and I just have to finish wiring the limit switches for the liftgate and it's on to pre-wiring and then putting the top on.  I already have a mod in mind for the liftgate control switches, what they supply isn't suitable for my use.  My gate is four feet wide, and I need a control on each side of the gate, not one handheld flapping around.  The good news is, that should be really easy to do.

Attachments

Images (1)
  • mceclip0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×