Skip to main content

Reply to "New Train Room Finally Getting A Layout! (Last Update: 07/02/2022)"

gunrunnerjohn posted:

Moving along, all the Mianne stuff is assembled, and I just have to finish wiring the limit switches for the liftgate and it's on to pre-wiring and then putting the top on.  I already have a mod in mind for the liftgate control switches, what they supply isn't suitable for my use.  My gate is four feet wide, and I need a control on each side of the gate, not one handheld flapping around.  The good news is, that should be really easy to do.

Looks like the first trains might be on time!...........Pat

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×