Skip to main content

Reply to "New Winter Project - Final Update 7-5-22"

Making progress .... got the entrance/exit holes in the closets expanded to full size and got the long boar stained and ready for poly. I also cut some leveling blocks that I'll stain and attach to the outside of the closet walls to level the board and track both to the existing main line and to itself. The blocks will also hide any irregularity in the bottom cut of the holes. 

LEFT SIDE HOLECENTER HOLERIGHT SIDE HOLELEVELING BLOCKS

Attachments

Images (4)
  • LEFT SIDE HOLE
  • CENTER HOLE
  • RIGHT SIDE HOLE
  • LEVELING BLOCKS

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×