Skip to main content

Reply to "Benchwork - Laying Track"

@DoubleDAZ posted:

Ok, John, here's what I come up with using 25'. I added some preliminary trackage just to get an idea what will fit. The bench work is all 30" reach. Ignore the 16'7" and note that it doesn't watch the yellow area.

john 2020-08-29 daz

 

Hi Dave,

Looks great! I will fix the yellow area's as they are off and were onl a general guidline which makes it confusing to sa the least. On the bottom/north  wall there is a 4" bump out 18' from the east wall. The bump out is 19" long It looks like the yellow hide that feature. I'll make corrections and repost.

Again thanks for your help!

John

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×