Skip to main content

Reply to "Benchwork - Laying Track"

John, The plan looks like a good start.  I'll leave suggestions for the yard and turntable area for others, since I never had the space to do either.  Are you planning to use a double track bridge for the walkthrough opening on the right?  It would be easier than bridges on two levels like I have.  That means the grade from there to the first overpass would be pretty steep, though my 4% grades are manageable for the short trains I'll run.  I'm thinking Dave is away on his trip to Georgia about now, so I don't know when he will be able to look at it.  I never did get figured out how to setup grades on SCARM.  He did it for me.

The blue walls look great!  Yes some lighting around those ducts would help a lot.  Are you going to leave the ceilings open, that is no drop ceiling?  I see a lot of people who do that paint all the joists black so they aren't so noticable and it keeps the dust to a manageable level.  I left my floor bare concrete.  Are you going to do the same, or put in some floor covering?  I may do something in the future, like the interlocking rubber mats in the walking area, but there is only so much money to work with.  

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×