Skip to main content

Reply to "Benchwork - Laying Track"

@Mallard4468 posted:

My 2 cents regarding layout height...  One portion of my layout is at about mid-chest (around the top of the strike zone).  This shortens my useful reach, but it also makes it easy to sit on a rolling stool underneath to work on wiring and gives a more interesting viewing perspective.  It might also be a bit high if being viewable by small children was a consideration.  The other portion is about waist high - easier to work on from above, but I need to work on my back on a creeper to do things underneath, which I don't enjoy.

When I do it over, I'm not sure which way I'll go.

It's a personal decision based on reach, mobility, and preferred viewing angle.  Perhaps it would be useful to set up a table with some trains on it and raise/lower the height and see what works best for you.

Thank you for the input, I like the idea of setting up a table and adjusting the height with some trains on top. Reach is hopefully a secondary consideration as I am looking at an overhead creeper. I am 6' tall and working below decks is more of a concern as it will be a hard hat area for sure.

Again Thanks for the suggestions!

John

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×