Skip to main content

Reply to "Benchwork - Laying Track"

Well, I'll be interested to see your ideas. The problem area is the yard. The only way I can see to lower the 4.0% and 4.4% grades there is by the yard tracks that go under the mainlines and/or reducing the clearance from 6.5". As near as I can tell, you need 1.5" to get down to 3.4%. I moved the passing sidings out of the way to make fiddling with the grades easier and here's what I've got so far. I lowered some of the yard tracks down 1.5" to see what that would do and got the 4.4% grade down, but that's certainly not recommended.

John 2020-10-13 daz

Attachments

Images (1)
  • John 2020-10-13 daz
Files (1)
Last edited by DoubleDAZ

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×