@DoubleDAZ posted:

Well, I'll be interested to see your ideas. The problem area is the yard. The only way I can see to lower the 4.0% and 4.4% grades there is by the yard tracks that go under the mainlines and/or reducing the clearance from 6.5". As near as I can tell, you need 1.5" to get down to 3.4%. I moved the passing sidings out of the way to make fiddling with the grades easier and here's what I've got so far. I lowered some of the yard tracks down 1.5" to see what that would do and got the 4.4% grade down, but that's certainly not recommended.

John 2020-10-13 daz

Hi Dave, I was thinking on moving the double crossover to the two sidings up towards the top, then having a turnout to the yard further to the yellow track 072 last curve. Doing that may have the grades lower with a longer start. I'll work on this in the morning and post an example.

Attachments

Images (1)
  • John 2020-10-12 daz2a

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×