Skip to main content

Reply to "Benchwork - Laying Track"

GRJ, I assume the 6.5” elevation John is using in SCARM includes 3/4” plywood, 1/2” Homasote and 1/4” roadbed making his actual clearance 5” (or 5 1/4” if he’s using 1/2” plywood for the elevated sections). He could lower the clearance over the yard if he used just an elevated trestle setup or 1/2” plywood without the Homasote. He hasn’t said how tall his tallest rolling stock is.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×