Skip to main content

Reply to "Benchwork - Laying Track"

My total elevation from the main level to the upper level is 7".  I'm using half inch plywood for the upper deck, and 1/4" foam roadbed.  The upper deck doesn't have Homasote, the main level does, but that doesn't enter into the calculation.  I'm figuring the upper deck and the supports to be 1", track height on the main level to be around 5/8" to the top of the rails.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×