Skip to main content

Reply to "Benchwork - Laying Track"

That said, I’m going to delete my 2020-10-15 file, but I’ll see if I can integrate some of the changes in the current mainlines to get the grades down. Don’t forget, the grades are because I lowered the elevation to 6”, so if you still want 6 1/2” let me know.

There are ways to allow you to pull “into” the yard. One is to add a 2nd single track bridge to the topmost yard track and connect to the far orange curve on the other side. The other is to add 1 or more switches to the ends on the yard tracks, enough so an engine can pull in, disconnect, switch tracks and back out. You’d have to dedicate 2 yard tracks to that. I’ll work up an example of both if you want me too.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×