Skip to main content

Reply to "Benchwork - Laying Track"

Hello All, I am asking for your experience with using two bridges at different heights for entry to middle of layout. At the present I have a double track bridge that seems to be the answer, however combine that with a double crossover between the two main lines which also go over the bridge, this has caused either both lines to be at the same elevation. Or most of the lines are on a grade of some type. These grades also affect the towns and industries I would like to include in this build. It has me thinking I am wanting too much (yard, turntable, towns and industries)    Industries I am looking at are coal and recycle steel (as in junk yard with gantry crane). Small town or towns with some roads that cross tracks and have freight deliveries.

So again would having two different bridge heights help and would it be hard to incorporate into scenery?  Mark I know you are attempting this, what were the plus and minuses for you?

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×