Skip to main content

Reply to "Benchwork - Laying Track"

@DoubleDAZ posted:

John, I like the changes. I see there are some disconnects, but nothing that can’t be fixed during construction. The only problem might be the direction of the Bascule bridge. It’ll probably need to be reversed in order to fit without overhanging the edge or hitting the wall.

Hi Dave, If it weren’t for all your help it would still be going no where! How do you find disconnects so fast??!!

yes the bridge needs to be turned or redesigned lol

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×