Skip to main content

Reply to "Benchwork - Laying Track"

Jan posted:

Go with the largest curves you can fit in.  Here is a double mainline with O81/O90 curves.  The right side restricts using larger curves.  The 90 degree curves could be replaced with larger curves.

Jan

aegis21-jan-v1

I like Jan's double-track concept.   And concur with his suggestion on using the largest diameter than can fit.

I would drop the idea for the jut-out in the center, as you will need space for operators and builders to move around comfortably.  The 3'-wide aisle width is good, but you need more than just aisles IMO, you need space for two or three operators and visitors to move around the layout.   So retaining a larger open operating and train-watching area in the center will add value and enjoyment, more so than the added scenery or industry area.

Last edited by Ken-Oscale

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×