Skip to main content

Reply to "Benchwork - Laying Track"

John, Your first attempt at something in SCARM is better than mine was.    My thinking is if there is one reversing loop, then a second is needed to reverse back again, otherwise, why bother.  However, other folks see it differently and are quite happy.  My plan is a loop to loop, with the loops folded on top of each other.

I downloaded your plan and I see track level 1 which I take it is the subway route.  It makes sense.  I'll leave more analysis to the big guns.  I'm a cap gun or pop gun when it comes to track planning even though I have run trains for 50 years.  

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×