Skip to main content

Reply to "Benchwork - Laying Track"

DoubleDAZ posted:

Wonderful job Jan. I like it, but am concerned about the reach to the double crossover, unless John adds an access hatch by the spurs.

Thanks for the heads up on the dreaded reach factor.  I would like to avoid an access hatch if at all possible. Could possibly move the left crossover to the left until it becomes reachable. The other crossover could be moved towards the right as far as the Bridge??? Again Thanks Dave for picking up on that!

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×