Skip to main content

Reply to "Benchwork - Laying Track"

My only comment about dual mains is that they don’t need to be parallel around the entire layout. Obviously they need to be at the bridge and crossovers, everywhere else they can meander, go over/under, etc.

And crossovers don’t need to be close to each other either.

The wrinkle I see is the subway and I’m still not sure how that’s going to run. I assume it will eventually run close to the edge on a shelf with viewing stations at various points. It’s hard to design the run though without knowing what the min curve size needs to be, etc. if you hide most of it, it’s just a waste of track and money.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×