Skip to main content

Reply to "Benchwork - Laying Track"

DoubleDAZ posted:

Looks like this thread has come full circle and we're back to square one. 

Your examples are skewed though and are not fair comparisons. In the 1st one, you expanded certain sections and added access hatches that are only needed if you design a layout that needs them, such as some of those that were offered earlier in the thread. In the 2nd one, you shrunk the area where you had access hatches and moved the upper section down away from the wall.

Photo 1 shows the approximate space available for decking for an around-the-room design. It has a min 36" reach all the way around.

Photo 2 shows the approximate space available for a walk-around design. It also has a min 36" reach and the upper aisle is 30" wide, the lower 36".

Photo 3 is just a sample.

The only reason previous designs included access hatches was your desire for reversing loops when you don't really need them. You have more than enough room for double mains that can cross over/under each other (Photo 4).

Photo 1
deck1

Photo 2
deck2

Photo 3
john 2019-08-12

Photo 4
overpass

 

Hi DoubleDaz,

I have not abandoned original ideas. Just at this point, all options are still open and train table space, accessibility and usability are things that could use a second look.

Yes my examples are skewed and are only there to give a visual of what I would not do a good job of explaining. (you get my point from the last sentence lol ) I do not see your pics on this post, so I cannot comment on them at all.  Please repost those pics as they certainly will help.

Thanks for bringing my maybe foolish idea of reversing loops to light. Love to hear other opinions on reversing loops as I am certainly not steadfast on that idea. I have actually redesigned the layout with trying to incorporate track over and under ideas with the reversing loops, I had a great bowl of spaghetti when done. I did post I am having trouble with 3d design, meaning a flat surface with not tracks crossing I can visualize to a degree. Taking a design and then having different levels eludes me and may be a mountain of a road block, I could live initially with a flat layout to test my equipment and decide which control system to use and finalize the Railroad's purpose. It's purpose may only be to run trains and include various industries and move passengers from place to place. So prototypical operation may or may not evolve.

PS  I am sure over thinking everything!

Again Thanks for the help

Always Appreciated

John

Last edited by Aegis21

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×