1/28/20 to 2/10/20 – Believe it or not, that was all that really got accomplished in 2019. Looking back, I can’t tell you what else I was busy with, but we all know how life just seems to get in the way of our hobbies sometime. Anyway the next wall was finally insulated and framed.

20200128_19465920200128_19470620200210_06555720200210_065626



2/23/20 – Another wall is insulated and framed. I had to install this wall in front of the soil lines, which meant I also had to relocate a cold water line at the ceiling where the top plate needed to go. It all worked out in the end.

20200201_13060920200223_15470920200223_154725



3/1/20 – On the last area I had to frame, I had to install a doorway into the furnace room. Time to watch more YouTube videos. I was happy with the way it came out. I also had to frame around a triangle shaped bump out. We have a corner fire place upstairs and this is the foundation for the fireplace. Since this is inside the basement, I did not insulate these walls.

20200301_18264220200301_18285720200301_18291020200301_18293420200301_182945

Attachments

Images (12)
  • 20200128_194659
  • 20200128_194706
  • 20200210_065557
  • 20200210_065626
  • 20200201_130609
  • 20200223_154709
  • 20200223_154725
  • 20200301_182642
  • 20200301_182857
  • 20200301_182910
  • 20200301_182934
  • 20200301_182945