Skip to main content

Reply to "NJCJOE's New Train Room - 9/24/23 - O Gauge Track Weathering"

8/16/20 – When it came time to frame out the soffit area, the area around the ductwork, I originally planned on sheet rocking it, but since my framing skills were limited, I decided to have the ceiling contractor frame around it with ceiling drops. This is where the suspended ceiling is continued down and around the ductwork. A contractor friend said I would not be happy with this as it doesn’t look all that great. He suggested using 1-5/8” steel stud framing and covering it with drywall. He offered to help so that was what we did. I’m glad I went with this method.

20200827_06020720200827_06023720200827_06022120200901_14311920200901_14320420200827_060200

Attachments

Images (6)
  • 20200827_060207
  • 20200827_060237
  • 20200827_060221
  • 20200901_143119
  • 20200901_143204
  • 20200827_060200
OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
330-757-3020

www.ogaugerr.com
×
×
×
×
×