12/12/20 – Time for drywall! My buddy offered to come down and give me a hand hanging the “rock”, which was a good idea since I never did this before either. Since it was early December I told him to wait until after the holidays to come down and start. Well, I got bored. Watched some more videos. Thank goodness they don’t charge you for watching those. And the next thing you know, I had some drywall in place. I just kept working my way around the room and before I knew it the walls were done with the exception of the areas that contacted the soffit. I made some minor mistakes but was pretty happy with the end result.

20201212_13542220201213_15555320201219_15533220201220_12202020201228_07031620201230_15233820210131_151154



2/6/21 – My two friends came down and we finished installing the soffit drywall. I then finished buttoning up the drywall on the walls and just like that, the sheet rocking was complete.

20210207_14150320210207_14150720210210_13255620210210_13253520210210_13253120210210_13252020210210_132632

Attachments

Images (14)
  • 20201212_135422
  • 20201213_155553
  • 20201219_155332
  • 20201220_122020
  • 20201228_070316
  • 20201230_152338
  • 20210131_151154
  • 20210207_141503
  • 20210207_141507
  • 20210210_132556
  • 20210210_132535
  • 20210210_132531
  • 20210210_132520
  • 20210210_132632

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×