I'm still working on that John. I did get the one passing siding in on the O gauge. Would still like to get another siding or two in. It's a tough balance of having easy access to the entire layout and get the sidings in. There are a couple of spots along the back wall that access is a little harder than I want right now, especially because of the two layouts at different levels. I also don't want the entire layout covered with track leaving no place for structures.
|