Skip to main content

Reply to "NMRA MMR #601 Pastor John Siegle: a 3-Railer! Yes! The only one so far..."

Neal, are you going to scratch build the turnout in 3 rail or 2 rail.  I've scratch built a few turnouts, I was taught by a gentlemen who had a fabulous HO scale layout in an out building in his backyard back in El Paso, his track work was impeccable, you could back a 100 car freight train through his yards and I never experienced or saw a derailment.  He made me a couple of jigs and a template so you could line out your "frog" and then build your frog right on top of it.  He used a sheet of Zink because the solder didn't stick to it.  A few years later when I was in Sn3, Fast Tracks, up in Canada, came out with the jigs to do what I had been doing by hand and it was way faster, you were still scratch building the turnout but you just used their jigs.  They made filing the points so much easier and aligning the frogs at lot faster and more accurate.  Unfortunately, John moved away and I lost touch with him, I'm pretty sure he has passed away, this was back in the 80's and he was 84 at that time but I always that he was in his 60's.  Good luck on getting you MMR, I hope you do.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×