This train is grossly long! (144 is a gross!)
But there has to a cost in time and money to build and break up a train this size. Can the yards take it? Doubling and trippling to build. At least in Houston, UP Englewood would choke! And if you have a breakdown mid train, ouch! Are passing sidings long enough for two of these monsters to pass?