Skip to main content

Another New Layout Build Thread :) ! -- Lift Section is Operational !!!

I have been working on my new layout for several weeks - doing benchwork, running bus wires, working on track layout, etc.  I decided to tackle the power center before actually laying track and went with, what I think, is a creative way to mount and operate the ZW-L.  The "reveal-a-shelf" brackets are used in kitchens, generally for mixers (up to 60 pounds) to be stored out of sight in a cupboard.  I figured it would work for my transformer and Legacy command base.  When ready to use, simply pull the shelf up and out until it locks.  When finished, pull the levers and lower it out of the way.

The sides of the cabinet house the Power Bricks for the outer 3 tracks, which will be Legacy only.  The ZW-L will handle the inner 2 loops and allow for the option of command or conventional control, and control 2 accessory bus lines.

Dennis

Command Center 1Command Center 2Command Center 4Command Center 5Command Center 6Command Center 7Command Center 8

Attachments

Images (7)
  • Command Center 1
  • Command Center 2
  • Command Center 4
  • Command Center 5
  • Command Center 6
  • Command Center 7
  • Command Center 8
Last edited by dennish
Original Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×