Skip to main content

Reply to "Another New Layout Build Thread :) ! -- Lift Section is Operational !!!"

Speaking of power centers, here's my control center with power and command/WiFi systems.

I run 98% command, so I have the PH180 bricks.  For conventional, I have the two variable channels on the MTH TIU, one on the mainline and one on sidings. Along the top row are the DCS Perpetual Watchdog generators for everything but the mainline.

All my DZ-2500 switch machines come to the punch-down blocks near the bottom.  Right now the wiring is in flux, I'm working on a fix for the serial data issues for the CSM2 LCS boxes so I can clean up the wiring and lose the DZ-1002 Data Driver.  The relay boards at the top are for switching power to sidings remotely.  Most of my control wiring is CAT5 Ethernet cable.

Attachments

Images (2)
  • mceclip0
  • mceclip1

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×