Skip to main content

Reply to "Another New Layout Build Thread :) ! -- Lift Section is Operational !!!"

A look at the wiring!  The ABSOLUTE BEST piece of advice I have gotten on the forum is to run as many wires as possible BEFORE the deck is put on!  Much easier access!

Wiring 1Wiring 2Wiring 4

I decide to remove the grounding bars and use the remaining spots on the barrier strip for grounding.  There is a picture of a completed "feeder station" below.  There are a total of 18 of those for the layout.

Wiring 11Wiring 12

The before and after photos of a "feeder drop station".

Feeder Drop 1

Feeder Drop 3Feeder Drop 2

Attachments

Images (10)
  • Wiring 1
  • Wiring 2
  • Wiring 4
  • Wiring 8
  • Wiring 9
  • Wiring 11
  • Wiring 12
  • Feeder Drop 1
  • Feeder Drop 2
  • Feeder Drop 3

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×