I agree: Wiring before the deck goes on is the way to go! I did that with the both levels of my new layout. Unfortunately, I've changed the wiring plan significantly for the upper lever. It is no fun making those connections with the frames in position and the decks installed! Contortion City!
Hmmm... I may have just renamed the town!
Chris
LVHR