Skip to main content

Reply to "Another New Layout Build Thread :) ! -- Lift Section is Operational !!!"

Some track laying pictures:

I made a couple of jigs to keep the straight runs "straight-ish".  I have 2 runs of about 20 feet each that are essentially straight, so I figured it was worth the investment in time to make these.  The holes in the jig are for drilling holes in the deck for wire drops.  Because I am laying track on short-napped carpet (a sin for some people on the forum ), I heat up the drill bit with a torch and drill the holes through the template and I get no puling of fiber in the carpet.  Works like a charm!  We have run trains on carpet for our club for years and never once have I ever had to pull carpet fibers out of a locomotive.  I see it as instant ballast.  It looks great against green carpet for grass or brown carpet for "summer grass".

Dennis

Track Guide 1Track Guide 2Track Guide 4Track Guide 5Track Guide 6Track Guide 7Track Guide 9Track Guide 10Track Guide 12

Attachments

Images (9)
  • Track Guide 1
  • Track Guide 2
  • Track Guide 4
  • Track Guide 5
  • Track Guide 6
  • Track Guide 7
  • Track Guide 9
  • Track Guide 10
  • Track Guide 12

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×