Skip to main content

Reply to "Now Adding Desert Plants To Layout, BUT NO TREES!"

 

HEY OWEN, 

 

Thanks for backing me, Owen...your checks will keep coming!

 

Here are examples of the "2 pieces I've glued together":

 

Would you like to know how many 3/8", 5/16" and 1/4" lag bolts went into this project?

 

All the structural assemblies were lag-bolted into the wall studs of the game room, using 3/8" Lag bolts, stiffening the game room itself!

 

What about 3/8" hex bolts, nuts, & washers for bolting the 2x4 framework together? No nails were used.

 

What about the dozens of track spikes for this 124-foot layout, with soldered rails on the curves?

 

Also the dozens of shelf brackets, and how about the many 4x8 sheets of OSB sub-roofing panels, and the gallon of desert-tinted paint?

 

Most of the work on my "Calico Freight Lines" railroad doesn't even show, but it took me almost a year to build it!

 

Yeah...I can glue 2 pieces together...note the tools I used!

 

RIP TRACK

 

002

007

005

006

011

002

001

Attachments

Images (7)
  • 007
  • 005
  • 006
  • 013
  • 001
  • 001
  • 011
Last edited by Former Member

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×