JD2035RR,  Thanks for your responses.

  1. I will be operating conventionally.  I have two ZW transformers and 1 LW transformers but have not finalized whether I will use more than one for the layout.
  2. I cut the layout down to 5 foot by 9 foot so I can get to all sides.  The support framework is also on rollers so I can move it (up to 18 inches in all directions) if necessary to get greater access to one side.
  3. As I stated previously, I tried to include as many operating accessories as I could so my grandson could push buttons to make things "work".  I tried to include more/longer sidings but could not figure out how to work them into the layout.  I kept running into restrictions on spacing between tracks to give access to both sides of accessories.  The 97 Coal Elevator needs 12 inches between tracks while the 456 Coal Ramp/ 397 Coal Loader need 7 3/4 inch spacing.   The 164 Lumber Loader needs 10 3/4 inches between tracks.   
  4. In order to use the the 456 Coal Ramp, the 397 Coal Loader, and the 497 Coal Loader, I need to make a coal car the last one so it can be reversed onto their respective tracks.  Is their a way in this configuration to put one coal car at the end, empty/fill the car, drop the car somewhere and repeat the operation with another coal car?   I need to think more about how these operations can be accomplished without the ability to change the direction of the engines in both directions.
  5. Does anyone have any suggestions as to how to add elevated sections of track to this layout?
  6. Are their other locations where sidings could be added?

Since this is my first attempt at a layout design, I appreciate everyone's  suggestions.