I added a bunch of ducks lined up like they usually float in the water, put a fisherman on tne inside of the bridge dropping his fishing line into water and added 2 more boats to the water below the Atlas double line bridge. The bridge is in the background behind where I was scenicking. More pictures to follow.
The lift up hatch in the center of our American Flyer area to be attached real soon with scenery work to take place on the southern end of the layout. Bud is currently working on the elevated area on the south end and wiring of those accessories will be done soon.